According to the Army Corps of Engineers, after much analysis and review, they have determined that the most effective risk reduction measures to construct at Howard Hanson Dam would be to rehabilitate the existing drainage tunnel, add a branch to that tunnel through the area of highest concern to intercept seepage, and to install additional [...]
read more...




